FOR INTERMEDIARIES ONLY

Hydro Power Insurance

Cover options available for contract works; owned plant & machinery; hired in plant; public liability; contractors JCT 6.5.1, terrorism and delay in start-up.
Cover provided as standard for alterations, additions & improvements; removal of debris; professional fees; temporary removal; fire extinguishing; maintaining machinery guarantees; additional costs for repairs. Variable limits apply.
Optional additional cover available for terrorism; business interruption; public and products liability; commercial legal expenses; employers’ liability and D&O. Variable limits apply.

Our preferred risks are commercial operators of run of river hydro power that:
  • produce between 500KW and 10MW
  • have plant and machinery that's less than 25 years old
  • are known and have proven plant and equipment
  • have equipment with the appropriate technical accreditations
  • have the correct supervisory controls and data acquisition (SCADA) systems in place
  • don't use any obselete plant
  • use approved operations and maintenance companies
  • have new equipment and installations under warranty.
Hydro Power provides flexible insurance with the options of either construction or operational covers.
 
Our engineering, construction and power experts are able to consult at any stage of a renewable energy project and installation.
We can also offer additional services such as statutory or one-off inspections, on-site advice in the field of electrical, energy and environmental services or health & safety audits.
We’ve been carbon neutral since 2012. As a founding member of the Net Zero Asset Owner Alliance we are passionate about green energy.
 

Have a question? Contact your nearest branch.

This promotional material is intended for insurance broker use only and no-one else should rely upon it.
It must not be made available to anyone other than the intended recipient, either in its original form or any reproduction.